We are not going for fast, we are not going for lowered and heavily modified, just nice and usable… maybe with patina.. maybe with flames !
- Remove Engine and Gearbox
- Remove Front Beam
- Put Gus on Roll Over Jig
- Inspect and Repair / Fix / Protect Underside
- Decide on Paint Scheme and If We Are Having a Pop Top
- Prepare Roof and Chop Hole / Paint etc..
- Replace Gearbox with 1500 Straight Axle Unit and Refurbish Rear Brakes
- Source 1600 Engine to Replace Current 1300 Unit
- Refurbish Steering and Front Brakes
- Take off Roll Over Jig!
- Re-Install Beam
- Re-Install Gearbox and Engine
- Sort Out Wiring
- Get MOT ! ( Summer 2018 Target )
- External Paint ??
- Replace Rubber Seals and Refurb Air Stream Windows
- Use !
- Decide on Interior
- ?
- ?